RFP RESPONSE
WATER JET CUTTING SERVICESRAINBOW LAKEOWA | JSK WINTER PROJECT
Innovative Well Abandonment’s response to JSK Consulting Ltd.’s Request for Proposal for the 88-well Rainbow Lake winter program, organized by the section headings in the Vendor Instructions.
- Service Category
- Water Jet Cutting Services
- Project
- Rainbow Lake Winter Project – Shared Services
- Prepared For
- JSK Consulting Ltd. — Jodie Nichols & Mike Early
- Prepared By
- Innovative Well Abandonment
- Program
- 88-well program — Rainbow Lake, Alberta
- Start Date
- December 1, 2026
- Access
- Winter access — camp accommodations provided by JSK
- Work Hours
- 10 hours per day
Compliant








SECOR
WCB Status
SAFETY STATISTICS
Contractor Management
01 — Scope of Work
Understanding of Scope
We have reviewed the Water Jet Cutting Services Scope of Work and confirm we can supply the personnel, equipment, supervision, transportation and consumables required.
Program Scope
To provide ultra-high pressure water jet cutting services for wellhead casings and pipeline risers.
Well and Pipeline Inventory
- Well abandonmentsProgram could expand to 110 well abandonments
- 088
- Pipeline abandonments
- 0106
02 — Capacity & Capability
Built for Remote Winter Work
Experience and capacity relevant to the Rainbow Lake Winter Project.
Relevant Experience
Northern & Remote
Winter Conditions
Crews
Schedule
KPIs
Mobilization
Multiple Locations
References
03 — Equipment
Equipment List
Equipment proposed for the work.
| Equipment | Make / Model |
|---|---|
UHP waterjet cutting truck
| Custom-designed UHP system |
| Case 590 backhoe | Case 590 |
| Support Truck | F350 1-ton truck |

All equipment is inspected before mobilization and complies with manufacturer specifications, applicable legislation and project requirements. Current location: Edmonton, AB.
04 — Personnel
Personnel & Qualifications
Trained, competent operators experienced in high-pressure water jetting. Competency records available on request.
- Positions
- UHP Supervisor, UHP Operator, Equipment Labour
- Supervisor availability
- Dedicated supervisor on every crew
- Shift capability
- 10 hours of productive time in the field
- Additional crews
- Option for 2nd cutting truck crew
- Remote-work experience
- Over 17,000 successful cut & caps across Western Canada in various remote locations.
05 — Pricing
Budgetary Rate Schedule
All rates in CAD, GST extra.
Option 1 — Budgetary Pricing
Remote Cut & Cap
$0$1,350
per well
Centralizer or vented cap
Includes: cut truck, crew, consumables, vented cap
Riser Cut
$0$300
per riser
Based on cutting a 3" or 4" riser on the same location as the wellhead.
Pricing includes pipeline plug.
If cutting riser on same site as the wellhead.
Pricing Schedule
UHP Cutting Truck — crew travel (mobilization / demobilization)
Per Hour
$0.00$375.00
Support Truck — travel
Per KM
$0.00$2.00
Standby
Hourly
$0.00$550.00
Conductor Barrel Charge
Per Inch
$0.00$30.00
Pile Cutting Production Rates
6-inch pile
08
per hour
8-inch pile
06
per hour
10-inch pile
05
per hour
Assumptions
- Camp accommodations provided by JSK, as per the RFP instructions. No LOA or subsistence charges.
- Crew 1 is not local to the area.
- Site access maintained and suitable for a cutting truck and crew.
- Confirm line locates and gas migration testing, casing-bent bubble test has been completed before cutting well.
- Gas detection and two-way communications per site requirements.
RFP Evaluation Weighting
06 — Deliverables
Field Deliverables
Documentation provided on completion of the work.
07 — References
Project References
Contact person, phone/email and dates to be confirmed for each reference.
SATURN OIL & GAS
Wellhead riser and pile cutting services
Contact: Dean Hooper
Phone: 403-218-6092
Email: dhopper@saturnoil.com
Location: AB, SK / dates: 2023 - Current
VERMILION ENERGY
Wellhead riser and pile cutting services
Contact: Scott Churchill
Phone: 403-512-3585
Email: schurchill@vermilionenergy.com
Location: AB, SK / dates: 2022 - Current
LIGHTHOUSE LIABILITY SOLUTIONS
Wellhead riser and pile cutting services
Contact: Patrick Gratton
Phone: 587-999-0339
Email: pgratton@lhe-group.com
Location: AB / dates: 2022 to current
08 — Supporting Documentation
Documents Available
Available on request during evaluation. Information in this response is commercially sensitive and provided in confidence for JSK's procurement process.
09 — Contacts
Contacts & Next Steps
Procurement contact at JSK and the Innovative Well Abandonment team responsible for this response.

JSK Consulting Ltd.
Address
5560 45th Street, Bay E3,Red Deer, Alberta
Innovative Well Abandonment
Address
11630 Kingsway NW,Edmonton, AB T5G 0X5